Rough wiring, or electrical rough-in, is the stage of a project when cable, boxes and conduit are installed inside open walls, floors and ceilings, before insulation and drywall. It is the foundation of every outlet, switch, light and appliance circuit you will use for decades. Mistakes at this stage are expensive to fix once walls are closed. Fuse HVAC & Appliance Repair provides rough-in wiring for remodels, room additions, new construction and commercial build-outs across Orlando and Central Florida.
Rough wiring is part of our electrical services. Because we also install HVAC systems and appliances, we plan circuits for the equipment that will actually be installed, not generic placeholders.
Kitchen remodels. Modern kitchens need more circuits than older ones: dedicated lines for the range, double oven, microwave, dishwasher, disposal and refrigerator, plus GFCI-protected countertop circuits. We plan for the appliances you have chosen.
Bathroom remodels. GFCI-protected circuits, exhaust fans, lighting and heated floors or towel warmers.
Room additions and garage conversions. New circuits, sometimes a sub-panel, plus wiring for a ductless mini-split to cool the new space.
Commercial tenant build-outs. Offices, retail spaces and restaurants need circuits planned around equipment, lighting and HVAC. We coordinate with other trades to keep the schedule on track.
On most remodels, electrical rough-in happens at the same time as HVAC and plumbing rough-in, and the trades need to share the same wall and ceiling cavities. Planning together avoids problems such as a duct run blocking an electrical box location or a new air handler without a dedicated circuit. Because Fuse also installs ductwork, air conditioners and mini-splits, we can plan electrical and HVAC work together when you need both, which keeps the schedule shorter and reduces change orders.
What is the difference between rough-in and finish electrical work?
Rough-in is everything installed before walls are closed: boxes, cable and conduit. Finish or trim-out is installing outlets, switches, fixtures and breakers after drywall and paint.
Does rough wiring need an inspection?
New circuits and remodel wiring generally require a permit and a rough-in inspection before insulation and drywall. We explain what applies to your project.
Can you add circuits to an existing home without opening every wall?
Often, yes. Depending on the layout, we can fish cable through attics, crawl spaces and existing walls with minimal openings.
Can you work with my general contractor's schedule?
Yes. We coordinate rough-in timing with the framing, HVAC and plumbing trades and schedule inspections so drywall is not delayed.
Do you also install the fixtures and devices after drywall?
Yes. We return for trim-out to install outlets, switches, lighting, breakers and dedicated appliance connections, then test every circuit.
Call (321) 421-0807 or book online to schedule a walkthrough in Orlando.